Pro Model Machines & Engineering Advanced
Double-Deck Steel Truss Bridge
Span a crystal river with a monumental double-deck truss bridge carrying a lower rail level, upper highway deck, and arched entry portals.
130
Tiles
13
Phases
46m
Build Time
Pro Blueprint · 130 Tiles
Pro Pass Required
Unlock the Interactive 3D Build for Double-Deck Steel Truss Bridge
Upgrade once with a Pro All-Access Pass to unlock this blueprint and every other Pro build in our library—no recurring subscription.
- Instant access to all 350+ 3D magnetic tile blueprints
- Full 360-degree 3D rotation & slow-motion magnetic snap replay
- Exact parts checklist & illustrated step-by-step build booklet
Or explore our 117 free 3D models with no sign-in required.
How to Build Double-Deck Steel Truss Bridge with Magnetic Tiles
This advanced machines & engineering magnetic tile build uses 130 tiles across 13 guided phases and takes about 46 minutes. Compatible with standard 3-inch magnetic tile sets including Magna-Tiles, Connetix, and PicassoTiles.
Tile Shapes Needed
- Standard Square × 66
- Tall Isosceles Triangle × 28
- 4-Pane Window × 20
- Arch Doorway × 16
Build Facts at a Glance
- Category
- Machines & Engineering
- Difficulty
- Advanced
- Total Magnetic Tiles
- 130
- Estimated Build Time
- 46 min